Project Overview
The 8-acre campus design includes a complete overhaul of three out of four older buildings along Terman Court. One demolished building is replaced by the main campus building with an iconic 70-foot tall atrium as its focal point. From the atrium, BioLegend employees access the upper floor labs, offices, break rooms and conference rooms.
A pedestrian bridge connects the atrium to the refurbished administrative and amenity building. The most sought after amenities, determined by their staff, include a fitness center with locker rooms, a kitchen, wellness bar, yoga rooms, game room, and other amenity spaces that encourages more collaboration and relaxation in between work week demands. The 250,000 square feet of outdoor amenities are a key to employee satisfaction, providing a place to relax or informally meet outside.
Forward thinking sustainable strategies include copious amounts of natural lighting through large windows and the atrium structure. An expansive green roof visually masks the presence of a 500-person multi-purpose room built off of the main building.
The new seven-story, 700-space parking garage is tucked behind the new main building. The garage supports an extensive photovoltaic system and provides electric car charging stations.
Services
Electrical Engineering, Lighting Design, Telecommunication Design
Share with others
Architect | Delawie Architects |
---|---|
Size | 179,000 SF |
Date of Completion | 2019 |