Project Overview
As part of a PPA, the school district installed 6.0 Megawatt (MW) of solar panels over 15 schools. All sites utilized car port or shade structures for panel mounting.
Services
Electrical Engineering, Lighting Design, PV Design
Share with others
Contractor | PFMG Solar |
---|---|
Size | 6MW |
Date of Completion | December 2018 |